Field rework checklist

Begin
Stap 1/5
CV Ruimte

Voer uw gegevens in

Dit is een verplicht veld.
Dit is een verplicht veld.

Type of installation

Buffer installed?

Appendages correct?

Indoor unit replaced?

Type of installed indoor unit:

Control bridge replaced?

Was temp sensor house in placed correctly on piping?

Was temp sensor house in conneted to Temp1?

All-electric: Boiler temp sensors connected correctly on bridge?

Cover placed?

Compressor aligned propperly?

Tubes alignment updated?

Was Overtempt switch mounted/present?

Temp sensor condenser placed correctly?

Mass matt replaced?

Control board type?

Control board replaced?

Which control board spacers?

Make picture of inside outdoor unit when open. Otherwise not necessary.

Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.

Heat pump test pass?

Noise test pass?

EPP screws replaced?

Appendage isolation added?

Hood placed?

Pipe isolation added?

Make picture of location outdoor unit and of from from house/ back of house where you can see location pump.

Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.

Do you have any aditional remarks?

Customer signed approval for good work?

Je bent verplichte velden vergeten in te vullen:
    Thank you! Your submission has been received!
    Oops! Something went wrong while submitting the form.